Benchuang's PCB manufacturing milestones trace the company's progression from its founding in 2007 to volume production of advanced HDI boards. The timeline below records selected company, technology and quality-system developments. For engineering teams, the useful question is not only when each milestone occurred, but which manufacturing and review capabilities it supports today.

Manufacturing and Technology Milestones

  • 2007.02

    Meizhou Benchuang Electronics was incorporated.

  • 2014.04

    Full-process mass production began.

  • 2014.09

    UL, CQC, quality management system and environmental management system certifications were obtained.

  • 2015.03

    Benchuang started batch production of second-order HDI products.

  • 2016.11

    The company was recognised as a high-tech enterprise.

  • 2017.01

    Benchuang was elected as a GPCA director unit.

  • 2018.06

    Mass production of third-order HDI products began.

  • 2018.09

    The Guangdong High-Precision Printed Circuit Board Engineering Technology Research Center was established.

  • 2021.06

    Benchuang was listed among the top 100 domestic-funded PCB enterprises.

  • 2023.12

    The company obtained occupational health and safety management system certification.

  • 2024.10

    The company obtained intellectual property compliance management system certification.

What the Milestone Timeline Shows

The sequence shows sustained investment in conventional PCB production, increasingly complex HDI structures and formal management systems. Teams evaluating a supplier should still confirm the fabrication or assembly scope required by their specific design. Ask which layer count, via structure, material, copper thickness, surface finish, inspection method and test stage apply to the project, and request the relevant capability details rather than relying on a company milestone alone.

For advanced interconnection projects, review the current HDI PCB manufacturing capabilities and the process considerations for stacked and staggered microvias. Conventional builds can be checked against the multilayer PCB manufacturing page.

Plan a PCB or PCBA Project with Benchuang

Prepare the board revision, Gerber or ODB++ data, stack-up requirements, quantities and target delivery date before requesting a quotation. For assembly, also provide the BOM, approved alternates, placement data and inspection or testing requirements. Review the PCB engineering and manufacturing service scope, then send the project files to Benchuang so fabrication, sourcing and assembly questions can be reviewed together.

Free to contact us